325 on the ropes
 
 
 
 

On December 16, 2001 the third section of our troop climbing wall was installed.
 
 
 
 

1
The third section is comprised of a wall with two different inclines.
 
 
 
 

2
All that remains is the addition of the plywood faces.
 
 
 

3
The party crew!
 
 
 

4
Chief Facility Manager cuts a new access hole to the attic.
 
 

5
A view from the balcony
 
 

BACK