325 on the ropes
 
 
 
 

On December 22, 2001 the third section face of our troop climbing wall was prepared for installation.
 
 
 
 

1
Fred drills the holes for the hand hold shafts.
 
 
 
 

2
Kenny squirts in adhesive and then Ryan installs the mollies.
 
 
 

3
The finished product!
 
 

BACK